Get In Touch
Via Don Giovanni Minzoni, 4/2 – Bologna
Tel. +39 051 1889 9436
Cell. +39 334 7438 127
Corporate Video

Adrilog

Client: Adrilog

Date: 2026

Location: Castel San Pietro T.

Category: Digital Content

Tags: Video

The inauguration of the new Adrilog logistics hub in Castel San Pietro Terme was a major corporate event, for which we managed the entire technological setup and technical direction. Thanks to the valuable collaboration with AB Service, we transformed the conference space by installing an impressive Ledwall and precisely managing the audio system and slide projection for the speakers. This custom setup allowed the new supply chain center to be presented with a strong visual impact, ensuring smooth, authoritative communication perfectly in line with the project’s importance.

In addition to the live staging, we dedicated ourselves to chronicling this important corporate milestone through comprehensive visual documentation. During the event, we produced an accurate photo and video reportage, but the true highlight of the project was the striking 90-day time-lapse that captured the entire assembly phase of the industrial shelving. By condensing months of construction site activity into a few highly effective moments, we delivered a wealth of precious and unique content to Adrilog, perfect for maximizing their institutional communication.

Back